Devonshire Bathroom

Water damaged bathroom remodel;

As the job progressed, we discovered the tub was cracked and leaking. As a result, the customer decided to do a full gut and renovation. They chose lifeproof flooring(our top choice in flooring, when not using tile) and Quartz countertops, specifically the "Moonrock" design. When we removed the tub, we also found that the subfloor needed to be replaced, as well as some framing.

*Please note that the closet was untouched because the customer intends to wall it off and put a cabinet accessible from the kitchen later on. The electrical was done by the customer who hadn't put in the fixture at the time I took these photos.

Previous
Previous

Apartments

Next
Next

Warmsprings Bathroom